Context: This Hale/P200 Telescope Cover Sheet shall be used by proposers from all P200 constituencies requesting classically-scheduled Hale Telescope observations. Some aspects of this form relate only to Caltech proposers. This form is designed exclusively for use on desktop computers.
Instructions: Fill in the required information. When finished, save the form on your computer as a PDF document
(press the PRINT button to open the print dialog box on your computer,
then save the form as a PDF)
to be merged with the cover sheet and the discussion section of your proposal.
Who
First Name
Last Name
Email
Email address should correspond to that used as Palomar Reservations system username. *
Telephone
Principal Investigator
Lead Observer
The PI or the Lead Observer will be the single-point contact with the Palomar
staff for all administrative and logistical matters pertaining to the project. * Email address should correspond to that used as Palomar Reservations system username.
0 / 1000
* 1000 characters maximum, unformatted text only, resize box as needed. (1) Abstracts should be a brief synopsis of the scientific project and should not include the details of the observing request (number of nights, etc.). (2) Abstracts will be posted on the schedule intended, in part, for public outreach, and should be written accordingly.
Institution
Proposer Status
Priority
Investigators submitting multiple proposals shall clearly indicate whether this proposal represents their top or primary priority or is of secondary importance in their submissions. Only one proposal should be designated as primary.
Linked to Keck 1Indicate if this P200 cover sheet is linked to a Keck proposal in this cycle. Relevant for Caltech proposers only.
Linked to P48 1Indicate if this P200 cover sheet is linked to a P48/Samuel Oschin proposal in this cycle. Relevant for Caltech proposers only.
Linked to P60 1Indicate if this P200 cover sheet is linked to a P60 proposal in this cycle. Relevant for Caltech proposers only.
Thesis Project
New/Cont Project 2Indicate if this is a new or continuing project request. New requests should estimate the total observing time/semesters for completion in the proposal discussion (template section 3.3). Continuing project proposals should review project status and estimate observing time/semesters needed for completion (template section 3.3).
Date- Specific 3Date-specific requests shall provide details in discussion (template section 2.5). Complete the Date-Specific Cover Sheet Supplement, and include it as an addendum to the proposal.
Large Project Status 5Relevant to Caltech proposers only: Caltech supports requests for Large Projects. This field should indicate the Large Project status of the request—Not Applicable (most projects), New Request for new Large Project applications, and Continuing for status reports on approved Large Projects.
Continuation Semester 6Applicable for previously approved Large Projects: list the number of this semester and the total semesters for the approved Large Project. Integer semester between 2 and 6.
of auth
1 Relevant for Caltech proposers only.
2 Indicate if this is a new or continuing project request. New requests should estimate the total observing time/semesters for completion in the proposal discussion (template section 3.3). Continuing project proposals should review project status and estimate observing time/semesters needed for completion (template section 3.3).
3 Date-specific requests shall provide details in discussion (template section 2.5). Complete the Date-Specific Cover Sheet Supplement, and include it as an addendum to the proposal.
4 Proposals requesting partial nights shall detail requests in discussion (template section 2.4).
5 Relevant to Caltech proposers only: Caltech supports requests for Large Projects. This field should indicate the Large Project status of the request—Not Applicable (most projects), New Request for new Large Project applications, and Continuing for status reports on approved Large Projects.
6 Applicable for previously approved Large Projects: list the number of this semester and the total semesters for the approved Large Project.
Collaborators
Name
Institution
Observing Team *
Expected to participate in observing.
Name
Institution
* Expected to participate in observing.
Observing Runs and Instruments
Fill in the table below to specify the instruments requested and your preferred/acceptable observing runs.
Select the instrument(s) you are requesting for the block from the pull-down menus. Requests for two simultaneous instrument setups must be justified in the proposal discussion (template section 2.1).
Enter the number of nights you are requesting for the block.
Specify your observing run preferences as P = Preferred or A = Acceptable
Use multiple request lines if you want your observing time split into two or more blocks (one line for each block, use buttons to add/delete blocks as needed).
To facilitate planning we provide approximate local sidereal time (LST) at Palomar sunset and sunrise (nautical twilight) for each run. (Use TOGGLE LST button to toggle visibility).
Lunar cycle description:
L = Light (<28% moon-free)
DE = Grey Dark Early (28%-72% moon-free)
D = Dark (>72% moon-free)
DL = Grey Dark Late (28%-72% moon-free)
Observing Time Preference and Instrument Selection for 2022A
From
01 Feb
05 Aug
10 Feb
20 Feb
24 Feb
06 Mar
11 Mar
21 Mar
25 Mar
05 Apr
09 Apr
19 Apr
23 Apr
To
04 Feb
09 Feb
19 Feb
23 Feb
05 Mar
10 Mar
20 Mar
24 Mar
04 Apr
08 Apr
18 Apr
22 Apr
03 May
Sunset
LST
03:21
03:40
04:18
04:52
05:25
05:58
06:31
07:09
07:42
08:20
08:54
09:27
10:06
Sunrise
LST
14:54
15:06
15:31
15:52
16:12
16:31
16:49
17:10
17:28
17:48
18:06
18:24
18:46
Block
CassRequests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Cass), provide name (below) and full description in proposal discussion.#
PrimeRequests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Prime), provide name (below) and full description in proposal discussion.#
Nights
1D
1DL
2L
2DE
2D
2DL
3L
3DE
3D
3DL
4L
4DE
4D
Blk 1
Blk 1
Blk 2
Blk 3
From
04 May
08 May
19 May
23 May
03 Jun
08 Jun
18 Jun
23 Jun
03 Jul
09 Jul
18 Jul
24 Jul
To
07 May
18 May
22 May
02 Jun
07 Jun
17 Jun
22 Jun
02 Jul
08 Jul
17 Jul
23 Jul
31 Jul
Sunset
LST
10:40
11:14
11:53
12:22
13:04
13:40
14:10
14:38
15:13
15:38
16:05
16:30
Sunrise
LST
19:05
19:26
19:51
20:10
20:42
21:12
21:40
22:10
22:50
23:22
00:00
00:38
Block
CassRequests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Cass), provide name (below) and full description in proposal discussion.#
PrimeRequests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Prime), provide name (below) and full description in proposal discussion.#
Nights
4DL
5L
5DE
5D
5DL
6L
6DE
6D
6DL
7L
7DE
7D
Blk 1
Blk 2
Blk 3
#Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1). * For own equipment (OE), provide name (below) and full description in proposal discussion.
Own Equipment
Enter name of instrument (140 characters max) and give full description in discussion (template section 2.1).
Please share your feedback on this page at the COO Feedback portal
Palomar Cover Sheet P200 v 2.0rc1
Form Last Updated: 15 September 2021
Parameters Last Updated: 26 August 2021 - RJB/AFB/ACM Generated on: 02 April 2025 at 09:25 GMT-7