Timeline ======== Here we document the timeline of changes to SEDM KP. .. table:: Table 1. SEDM KP Hardware Timeline +------------+-----------------------------------------------------------------------------------------+ | Date (UT) | Description | +============+=========================================================================================+ | 2022/10/18 | Power restored to Kitt Peak | +------------+-----------------------------------------------------------------------------------------+ | 2022/09/29 | Tri-prism and electronics panel installed, coolant lines purged, re-installed on scope | +------------+-----------------------------------------------------------------------------------------+ | 2022/06/11 | Contreras fire starts, burns power/internet lines, not contained until 2022/06/24 | +------------+-----------------------------------------------------------------------------------------+ | 2022/06/08 | SEDM KP delivered to Kitt Peak and first light with temporary prism | +------------+-----------------------------------------------------------------------------------------+ Table 1 shows the dates when major changes to the instrument hardware were made. This table does not capture adjustments of optics or minor hardware changes. Column 1 is the date the change was made, and column 2 describes the hardware change. Last updated on |version|