The third crane lift happened between 10am and 11am on Monday, 22 Dec. It went very smoothly. The primary/foam cone were lifted together as a unit.

( Click once for medium sized image. Click again for full size. )
100_0323
100_0323

Preparing for the lift
100_0326
100_0326

IMG_2871
IMG_2871

Oli did a quick final check for burrs on the primary flange as it was lifted.
100_0328
100_0328

100_0336
100_0336

This spreader triangle, constructed of 2" steel angle borrowed from FEMC, will be saved for us by Jack Corbin/Bill Johnson for as long as possible in case we need it next year.
100_0341
100_0341

The 20 thermometers installed on the bottom of the primary are visible.
100_0343
100_0343

100_0345
100_0345

100_0348
100_0348

100_0350
100_0350

With guide pins, Bill Johnson brings the primary straight down onto its flange.
100_0356
100_0356

100_0365
100_0365

Dave Carlson gave hands-on support throughout the lift process.
100_0367
100_0367

Arm clearance is OK.
100_0368
100_0368