pics : BICEP : 0312 pole trip : crane lift III |
Up |
![]() 100_0323 Preparing for the lift |
![]() 100_0326 |
![]() IMG_2871 Oli did a quick final check for burrs on the primary flange as it was lifted. |
![]() 100_0328 |
![]() 100_0336 This spreader triangle, constructed of 2" steel angle borrowed from FEMC, will be saved for us by Jack Corbin/Bill Johnson for as long as possible in case we need it next year. |
![]() 100_0341 The 20 thermometers installed on the bottom of the primary are visible. |
![]() 100_0343 |
![]() 100_0345 |
![]() 100_0348 |
![]() 100_0350 With guide pins, Bill Johnson brings the primary straight down onto its flange. |
![]() 100_0356 |
![]() 100_0365 Dave Carlson gave hands-on support throughout the lift process. |
![]() 100_0367 Arm clearance is OK. |
![]() 100_0368 |