![]() 100_0095 All crates were delivered to our site (primary shown here) within two days of our arrival. |
![]() 100_0097 The platform was erected by Dave Carlson et al. on Saturday morning, Dec 13. |
![]() 100_0099 The bolts holding the primary in its crate were found to have loosened in shipping; one fell out. |
![]() 100_0100 |
![]() 100_0101 |
![]() 100_0102 |
![]() 100_0103 |
![]() 100_0128 The staging platform. |
![]() 100_0131 |
![]() 100_0136 Deformed high spots on the mirror mounting flange were obvious around the bolt holes. |
![]() 100_0137 These were removed by hand, by countersinking and scraping. |
![]() 100_0139 |
![]() 100_0140 |
![]() 100_0141 A ding in the side of the flange also raised a high spot, which was scraped down. |
![]() 100_0142 |
![]() 100_0143 |
![]() 100_0182 1-wire serial temperature sensors were installed on the primary back. |
![]() 100_0185 |
![]() 100_0186 |
![]() 100_0232 The sensors were fitted with clips to attach to the primary ribs. |
![]() 100_0272 |
![]() 100_0273 |
![]() 100_0252 Making the spreader triangle out of 2" steel angle. |
![]() 100_0253 |
![]() 100_0268 This triangle will be saved by Jack Corbin/Bill Johnson if possible so we can use it next year. |
![]() 100_0270 The guard ring was adjusted to fit pretty well. |