R4 : 0408 high bay : 040804 highbay arrival |
Up |
![]() 100_1418 BICEP appears California Blvd, 1:00pm Wednesday 4 Aug 2004. |
![]() 100_1417 Some people don't pay attention to no parking signs |
![]() 100_1424 ...and they are harshly dealt with. |
![]() 100_1421 Backing BICEP onto campus. |
![]() 100_1426 Into the Synchrotron high bay. |
![]() 100_1428 There are three pieces. Rigging the second for lift. |
![]() 100_1431 Rigging the main piece, 5900 lbs., for crane lift |
![]() 100_1434 Larry (foreground) of John Hanson's group helped with the lifts. |
![]() 100_1435 Unwrapping the Az cable wrap. |
![]() 100_1436 We will want to thoroughly re-wrap before shipment to Pole. |
![]() 100_1439 The second piece consists of the upper elevation frame and two halves of the boot frame. |
![]() 100_1440 Details of wrapping. |
![]() 100_1441 Note assembly details of this pallet... |
![]() 100_1442 |
![]() 100_1448 |
![]() 100_1449 |
![]() 100_1450 |
![]() 100_1443 Team BICEP turns out for the unwrapping. |
![]() 100_1444 |
![]() 100_1447 Our new home. |