This form requires a wide format.

Please widen your browser window to ≥ 1380px.

Current width: 1280px


Hale/P200 Telescope Cover Sheet – Semester 2025B

Context: This Hale/P200 Telescope Cover Sheet shall be used by proposers from all P200 constituencies requesting classically-scheduled Hale Telescope observations. Some aspects of this form relate only to Caltech proposers. This form is designed exclusively for use on desktop computers.

Instructions: Fill in the required information. Most field titles have context and/or popup help text that is displayed on mouse hover. When finished, save the form on your computer as a PDF document (click the PRINT button to open the print dialog box on your computer, then save the form as a PDF) to be merged with the cover sheet and the discussion section of your proposal.

Our solicitation forms are evolving to add features and hopefully streamline program specification and proposal preparation. The forms are extensively tested with the Chrome browser on multiple platforms, and tested to a lesser extent with Safari and Firefox and Edge.

Some known, browser-specific issues::

  1. Safari may not invoke the print dialog correctly more than once using the PRINT button. In that circumstance we recommend using the browser print command (File→Print).
  2. Firefox does not clear/reset the form properly on refresh. To reset the form to its proper initial state use shift + refresh.
  3. Internet Explorer is not supported and its use is not recommended for these solicitation forms.

Use the COO Feedback page to report other issues or share your feedback on this form.



Who First Name Last Name Email Email address should correspond to that used as Palomar Reservations system username. * Phone
Principal Investigator
Lead Observer

The PI or the Lead Observer will be the single-point contact with the Palomar staff for all administrative and logistical matters pertaining to the project.
* Email address should correspond to that used as Palomar Reservations system username.
0 / 1000

* 1000 characters maximum, unformatted text only, resize box as needed. (1) Abstracts should be a brief synopsis of the scientific project and should not include the details of the observing request (number of nights, etc.). (2) Abstracts will be posted on the schedule intended, in part, for public outreach, and should be written accordingly.



Institution Proposer Status Priority Investigators submitting multiple proposals shall clearly indicate whether this proposal represents their top or primary priority or is of secondary importance in their submissions. Only one proposal should be designated as primary. Linked
to Keck 1 Indicate if this P200 cover sheet is linked to a Keck proposal in this cycle. Relevant for Caltech proposers only.
Linked
to P48 1 Indicate if this P200 cover sheet is linked to a P48/Samuel Oschin proposal in this cycle. Relevant for Caltech proposers only.
Linked
to P60 1 Indicate if this P200 cover sheet is linked to a P60 proposal in this cycle. Relevant for Caltech proposers only.
Thesis
Project
New/Cont Project 2 Indicate if this is a new or continuing project request. New requests should estimate the total observing time/semesters for completion in the proposal discussion (template section 3.3). Continuing project proposals should review project status and estimate observing time/semesters needed for completion (template section 3.3). Date-
Specific 3 Date-specific requests shall provide details in discussion (template section 2.5). Complete the Date-Specific Cover Sheet Supplement, and include it as an addendum to the proposal.
Partial
Nights 4 Proposals requesting partial nights shall detail requests in discussion (template section 2.4).
Large Project
Status 5 Relevant to Caltech proposers only: Caltech supports requests for Large Projects. This field should indicate the Large Project status of the request—Not Applicable (most projects), New Request for new Large Project applications, and Continuing for status reports on approved Large Projects.
Continuation
Semester 6 Applicable for previously approved Large Projects: list the number of this semester and the total semesters for the approved Large Project. Integer semester between 2 and 6.
 of  
 auth
1 Relevant for Caltech proposers only.
2 Indicate if this is a new or continuing project request. New requests should estimate the total observing time/semesters for completion in the proposal discussion (template section 3.3). Continuing project proposals should review project status and estimate observing time/semesters needed for completion (template section 3.3).
3 Date-specific requests shall provide details in discussion (template section 2.5). Complete the Date-Specific Cover Sheet Supplement, and include it as an addendum to the proposal.
4 Proposals requesting partial nights shall detail requests in discussion (template section 2.4).
5 Relevant to Caltech proposers only: Caltech supports requests for Large Projects. This field should indicate the Large Project status of the request—Not Applicable (most projects), New Request for new Large Project applications, and Continuing for status reports on approved Large Projects.
6 Applicable for previously approved Large Projects: list the number of this semester and the total semesters for the approved Large Project.
Collaborators
NameInstitution
Observing Team * Expected to participate in observing.
NameInstitution
  * Expected to participate in observing.

Observing Runs and Instruments

Fill in the table below to specify the instruments requested and your preferred/acceptable observing runs.

  • Select the instrument(s) you are requesting for the block from the pull-down menus. Requests for two simultaneous instrument setups must be justified in the proposal discussion (template section 2.1).
  • Enter the number of nights you are requesting for the block.
  • Specify your observing run preferences as P = Preferred or A = Acceptable
  • Use multiple request lines if you want your observing time split into two or more blocks (one line for each block, use buttons to add/delete blocks as needed).
  • To facilitate planning we provide approximate local sidereal time (LST) at Palomar sunset and sunrise (astronomical/18° twilight) for each run. (Use TOGGLE LST button to toggle visibility).
  • Lunar cycle description:
    L = Light
    (≤27% moon-free)
    DE = Grey Dark Early
    (28%–71% moon-free)
    D = Dark
    (≥72% moon-free)
    DL = Grey Dark Late
    (28%–71% moon-free)

Observing Time Preference and Instrument Selection for 2025B
From 01 Aug05 Aug15 Aug19 Aug30 Aug03 Sept13 Sept17 Sept28 Sept02 Oct12 Oct16 Oct27 Oct
To 04 Aug14 Aug18 Aug29 Aug02 Sept12 Sept16 Sept27 Sept01 Oct11 Oct15 Oct26 Oct31 Oct
Sunset LST 17:1917:3817:5618:1618:3318:5019:0719:2719:4520:0220:2220:4421:08
Sunrise LST 00:2801:0401:3702:1702:5103:2403:5804:3505:0805:4106:1306:5107:28
Block Cass Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Cass), provide name (below) and full description in proposal discussion. # Prime Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Prime), provide name (below) and full description in proposal discussion. # Nights 1DL2L2DE2D2DL3L3DE3D3DL4L4DE4D4DL
Blk 1
Blk 1
Blk 2
Blk 3
From 01 Nov10 Nov14 Nov25 Nov30 Nov09 Dec14 Dec24 Dec29 Dec07 Jan12 Jan23 Jan27 Jan
To 09 Nov13 Nov24 Nov29 Nov08 Dec13 Dec23 Dec28 Dec06 Jan11 Jan22 Jan26 Jan31 Jan
Sunset LST 21:3021:5022:1822:4823:1623:4400:1500:5001:2301:5602:3303:0703:30
Sunrise LST 08:0208:3009:0809:4610:1810:5111:2311:5812:2812:5613:2713:5214:10
Block Cass Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Cass), provide name (below) and full description in proposal discussion. # Prime Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1). For own equipment (OE-Prime), provide name (below) and full description in proposal discussion. # Nights 5L5DE5D5DL6L6DE6D6DL7L7DE7D7DL8L
Blk 1
Blk 2
Blk 3
# Requests for two-instrument setups must be justified in the proposal discussion (template section 2.1).
* For own equipment (OE), provide name (below) and full description in proposal discussion.

Own Equipment

Enter name of instrument (140 characters max) and give full description in discussion (template section 2.1).

Please share your feedback on this page at the COO Feedback portal

Palomar Cover Sheet P200 v 2.1.1
Framework Last Updated: 17 August 2022 - ACM
Parameters Last Updated: 18 February 2025 - RJB/AFB/ACM
Generated on: 14 March 2025 at 18:16 GMT-7