The fitted containers from OVRO arrive in Pasadena (1999 Jul 7)
Assembling the triangular spreader (1999 Jul 7-8)
The downconverter (1999 Jul 7)
Moving the telescope onto the flat rack (1999 Jul 8)
Wrapping and boxing the telescope (1999 July 8-20)
Packing the containers (1999 July 12-20)
Loading the containers onto trucks to the dock (1999 August 2-3)
Loading the telescope onto a flatbed truck (1999 August 4)
Unloading the telescope onto the dock at Antofagasta (1999 August 23)
The telescope arrives in San Pedro de Atacama (1999 August 27)
The telescope goes up to the site (1999 August 28)
Setting up the telescope and power plant (1999 August 31)
Erecting the dome (1999 September 2, 3, 7, 9)
Installing receivers (1999 October 29)
The Chajnantor Site (1999 October 14, 24, 27)
The headquarters of the CBI in San Pedro de Atacama (1999 Aug 30, Oct 30)